•Placed in shafts in high structures.
•Ensures employees are safe from falling.
•Used in to support wall formworks or assit in montage and demontage.
•Ensures the safety of employees below by holding materials, wastes and etc. falling from shafts.
•Projected according to internal measures of shafts and concrete load.
•NPU beams are manufactured according to different sizes, pieces and NPU sizes.
•Main girders supported with H20 wood beams or timbers.
•The surface is covered with 5x20-25cm woods.
•Gaps are left in the crane rings to help transport.
•The system climbed with the help of crane and reservation box left on concrete with movement of platform’s roller.
•When climbed with a crane, people should not be under, above or below the shaft for safety.
•Moved to upper floor wıthout disassemled with crane and moved untill the final floor is manufactrured.