A shop floor for modern textiles was to be constructed on a slope, preferably pillar-free. A timber and concrete composite surface, which was attached to the solid ferroconcrete suface on the slopeside, was chosen as a stiffening pane. Glued-in steel rods and the HBV shear connector type 90 were used as connecting means.