Apart from the floor plate, Stora Ensos 12,000 square meter CLT production facility is made exclusively from CLT solid timber. Stora Ensos second CLT factory commenced operations in 2012. During the same year, the CLT factory in Ybbs on the Danube was commended in the Commercial Building category of the Lower Austrian Timber Construction Awards.