The switch used to operate the SHE system
This priority switch has been developed for the Skycom CE control unit, to operate the smoke and heat extraction systems.
The switch overrides the control unit alarm so that the smoke-hatch skylights can be opened or closed by the firemen. It is advisable to install this switch if the Skycom CE control unit cannot be installed in the entrance hall of a building.
The technical facilities room is recommended as an alternative location for the control unit.
Developed for the Skycom CE control units