Connecting the wind turbine foundation and tower
Usage:
1. Grouting of wind turbine installations, i.e. installations installed using prestressing technology, such as foundation installation grouting of onshore wind turbines.
2. Equipment requiring excellent fatigue resistance.
3. Grouting is carried out under very harsh conditions, such as temperature as low as - 10 ℃.
4. Anchor the wind turbine tower bolts.
5. 25 mm to 30 mm void filling with high requirements for strength, modulus and ductility.
Advantage
1. Ultra high compressive strength: exceeding the highest grade of EN206, such as C100/115.
2. Ultra high modulus for special hardening properties.
3. Excellent fatigue resistance.
4. The early strength develops rapidly and can be put into use quickly and the temporary support can be removed.
5. At 20 ℃ for 24 hours, ≥ 50MPa.
6. High flow state, no bleeding, anti-rust, ensure consistent final physical performance and prevent blocking of grouting pump.
7. It can be pumped for a long distance and height.
8. It can be pumped or injected into complex areas or areas difficult to access by conventional grouting methods.