One objective of this majortask was to construct a building eco-efficient, capable of satisfying all requirements environmental considerations. Thus arises the need to isolate all elements of the metallic structure having the pnb executed placing the coated panel viroc and isolating a structural beam around the perimeter of the building. The panel was applied Duripanel 8mm thick, a total amount of 150m2.