The lightweight GRIDFLEX Slab Formwork is used for constructing residential and multi-storey buildings. Slab thicknesses up to 33 cm can be realized with the formwork. In order to concrete slabs up to 67 cm thick, the panels have to be additionally supported in the centre. The standard panel weighs only 20 kg and is swivelled upwards from the assembly area by means of the shuttering aid. Slab props are subsequently hooked in and vertically aligned. On the now accessible girder grid, the formlining of choice can be installed. The recurring systematic assembly sequence ensures fast working operations.
Safe shuttering procedure
by swivelling the panels upwards with site personnel positioned on the slab below
Simple working operations
through a systematic assembly sequence with only one standard and two compensation panels
Filler areas are quickly closed
through a simple change of direction of the panels along with the use of transverse and longitudinal infills
Slab formwork with accessible aluminium girder grid for formlining of choice
For slab thicknesses up to 33 cm, or with additional middle support of the element up to 67 cm
Lightweight components – the standard element weighs only 20 kg
Only 2 system components required for each standard field (Prophead and GRIDFLEX Standard Element)
Optimized for PEP / PEP Ergo Slab Props, only 0.5 props per m² of slab surface (slab thickness d = 33 cm)
Through the change in the forming direction, filler areas are reduced to a minimum
Closing of filler areas with only 2 different filler elements
Systematic assembly sequence
Simple, swivelled upwards from below guardrail solution for the slab edges