Two large halls were required for the storage and assembly of wind power stations rapidly but only for temporary use. HALTEC solved the problem in just 10 weeks with fully insulated aluminium halls to rent. These warehouse buildings comply with protection class 5 - fully insulated.
A dividing wall with intermediate gates separates the hall into storage and assembly areas.
A floor connection with bitumen sheeting is particularly suitable for rented halls.
Thanks to a side height of 7 m, there is even sufficient space for large shelves.
Mobile lighting "Aluflex".
Horizontal row of windows below the eaves.