The 156 m², heated lightweight construction hall in Duisburg was the ideal solution for the client. Equipped with a mobile electrical hall heating system, it is ideally suited for temporary use as a second workshop. In the new HALTEC BASIC hall, the sometimes noisy machines can be operated in a weather-protected, well-tempered and soundproofed environment.
Insulated HALTEC hall for a new site
Lack of space at the new company site was the trigger for the client to look for a suitable space solution. The new main workshop did not offer enough space to accommodate the entire machine park. A machine sale of stocks that were only used temporarily was out of the question – no, investments should be made in a second workshop. The decision was quickly made and HALTEC was found as a partner for the construction project. The BASIC hall of protection class No. 5 – thermally insulated is perfect for temporary workshop use and thus offers a new home to the rest of the machine park.
Heated lightweight construction hall with sandwich panelling
Once set up, the new heated lightweight building hall cuts a really good figure – it not only convinces with its beautiful hall character, but above all with its inner values. A mobile electric heater heats up the HALTEC BASIC HALL properly. The portable hall heating supplies the workshop with heat exactly when it is needed. Connected to the 400 volt power network, the mobile electric hall heating heats up super fast and exudes pleasant warmth.