The outer facade of this building was developed in cooperation with Dillinger Fabrik gelochter Bleche and consists of 3mm thick anodized (E6/EV1) aluminum panels. The total volume of this project consists of 3000m² which got delivered in more than 1000 single pieces. The continuously changing hole diameters in the range between 10 mm and 55 mm, create by an optical illusion a wavy effect which, after watching it a longer time, looks like a range of cylindrical bodies. The project time incl. planning and execution took about 6 months and was finished on December 1st, 2016. .